SCP-9453
Unknown
~
medium confidence
SCP-9453
Expected annual
$879K
One-time setup
$1.2M
Annual recurring
$839K
Personnel
14
Initial setup dominated by equipment procurement, structural stabilization, and contingency reserves (~$1.22M one-time), with ongoing staffing (monitoring + guards) and specialist research driving annual costs (~$839k/yr).
One-Time Capital Costs
Total: $1.2M
Annual Recurring Costs
Total: $839K/yr
Cost Scenarios
📊
Baseline
(baseline)
$839K/yr
Normal year with no significant incidents: routine monitoring, research, and upkeep.
no incidents
routine operations
🚨
Minor Incident
$939K/yr
Localized response for sensor-triggered events, attempted unauthorized entry, or small containment/cleanup actions.
false-positive alarms
unauthorized access attempt
localized contamination requiring short-term response
🚨
Major Breach
$2.3M/yr
Significant containment failure or public exposure requiring heavy response, deployment of specialists, full-site shutdown and major remediation.
sustained anomalous activity
structural failure/public discovery
major contamination or extraction operation
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Monitoring Operator / SOC Analyst | 3 | [#6] 24/7 camera and sensor monitoring shifts (2–4 FTEs; mid-range used). |
| Security Officer / MTF Agent | 8 | [#7] On-site vetted security for 24/7 coverage (6–8 guards rotating). |
| Site Security Supervisor | 1 | [#7] Supervisor/liaison for guard force and church coordination. |
| Research Scientist | 1 | [#13, #14] Leads sampling, analysis coordination and liaises with external labs/archaeologists. |
| Engineer / Maintenance | 1 | [#3, #4, #5, #18] Responsible for cameras/sensors/UPS/vehicle maintenance and technical support. |
Confidence Notes
Analyst notes provide detailed line items and ranges but many items have wide ranges (local contracting in Turkey, uncertain lease arrangements, and large contingent escalation reserves). Staffing and contingency are major drivers and introduce uncertainty.