SCP-9831
Unknown
~
medium confidence
SCP-9831
Expected annual
$1.5M
One-time setup
$1.9M
Annual recurring
$1.4M
Personnel
11
Initial one-time containment and mitigation hardware and retrofits are moderate but large contingency upgrades drive higher capital risk; recurring costs are dominated by specialist staff wages (security, research, medical) and ongoing research/IT/mitigation budgets, totaling roughly $1.43M/yr.
One-Time Capital Costs
Total: $1.9M
Annual Recurring Costs
Total: $1.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.4M/yr
Normal year with no major incidents; ongoing personnel, research, maintenance, and consumables costs only.
routine operations
scheduled research and maintenance
🚨
Minor Incident
$1.5M/yr
Localized contamination or single-exposure event requiring targeted amnestic use, extra disposal, short-term overtime, and counseling.
single personnel/media exposure
targeted destruction/disposal and medical response
🚨
Major Breach
$1.9M/yr
Significant breach or contamination event requiring emergency relocation, large-scale medical response, investigative research and legal action, and equipment replacement.
containment failure
multiple exposures or damaged media
🚨
Catastrophic Breach
$2.4M/yr
Severe, long-term escalation requiring major capital upgrades (remote bunker/relocation), extended MTF deployment, and large legal/medical liabilities.
major uncontrolled spread
change in SCP behavior requiring hardening
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#5] 24/7 guard coverage with relief and leave accounted for (~6 on-site guards used in wage estimate). |
| Research Scientist | 3 | [#6] 1 senior researcher + 2 assistants dedicated to containment/research (salaries included in staff_wages). |
| Medical Officer | 1 | [#7] Part-time site physician/neurospecialist fraction (counted as 1 head on staff; salary fraction included in staff_wages). |
| Administrative Staff | 1 | [#22] Scheduling, records and chain-of-custody management (0.5–1.0 FTE; pro-rated into staff_wages). |
Confidence Notes
Line-item estimates are provided by analyst notes with concrete figures for many categories, but uncertainty remains around project durations, incident probabilities, and the scale/cost of worst-case escalations, so medium confidence is appropriate.