SCP-985
Euclid
~
medium confidence
SCP-985
Expected annual
$2.5M
One-time setup
$970K
Annual recurring
$2.4M
Personnel
14
Initial capital outlay is roughly $970,000 driven by lab buildout, containment lockers, vehicle purchase, and insurance seed funds; steady-state annual operating costs are approximately $2.41 million driven mainly by staff wages, contingency/reserve allocations, airport compensation, and legal/PR budgets.
One-Time Capital Costs
Total: $970K
Annual Recurring Costs
Total: $2.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.4M/yr
Normal operational year with no major incidents; all recurring programs continue as budgeted.
steady production of SCP-985-1 at manageable rate
no major contamination events
airport cooperation maintained
🚨
Minor Incident
$2.6M/yr
Single contaminated or hazardous SCP-985-1 item causes a short lockdown, targeted cleanup, small settlements and overtime.
isolated hazardous item causes localized lockdown
limited public exposure or minor injuries
🚨
Major Lockdown
$3.9M/yr
Full terminal or multi-section lockdown due to a hazardous SCP-985-1 item causing infrastructure damage, widespread compensation and extended cleanup.
large-scale contamination or mechanical damage
multiple injuries and prolonged terminal closure
🚨
Catastrophic Breach
$7.4M/yr
Severe destructive event (as per Addendum 985-003) causing deaths, major infrastructure loss, long-term shutdown and large liability exposure.
release of destructive anomalous material from SCP-985-1
fatalities, large-scale terminal damage, long-term exposure
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Observer / Monitoring Technician | 5 | [#5] ~5 full-time observers to provide 24/7 live-feed monitoring, shift coverage and leave. |
| Security Officer / MTF Agent | 6 | [#6] On-call reserve/lockdown rapid response team comprising armed security and ops personnel. |
| Research Scientist | 2 | [#17] Two research scientists dedicated to analysis and experiments on SCP-985-1. |
| Laboratory Technician | 1 | [#17] One technician supporting lab operations, sample processing and daily scanning. |
Confidence Notes
Line-item cost estimates are reasonably well-specified by analyst notes (salaries, hardware, reserves), but frequency of production, hazard severity, and potential scale-up or relocation uncertainties justify a medium confidence rating.