SCP-9876
Unknown
?
low confidence
SCP-9876 - Dawn of Darkness
Expected annual
$2.9M
One-time setup
$9.3M
Annual recurring
$2.7M
Personnel
17
Initial containment and monitoring setup requires multi-million-dollar one-time investments (R&D, contingency reserve, and exploration program are the largest drivers). Recurring annual costs are driven primarily by specialized staff wages, exploration operations, and contingency/top-up budgeting totaling roughly $2.66M/yr.
One-Time Capital Costs
Total: $9.3M
Annual Recurring Costs
Total: $2.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.7M/yr
Normal, uneventful year with routine research, maintenance, and operations only.
no incidents
scheduled research only
🚨
Minor Incident
$2.9M/yr
Localized containment incident requiring repairs, limited remediation, medical follow-up and legal consultation.
small containment breach
equipment failure
limited staff exposure
🚨
Major Breach
$7.7M/yr
Significant containment failure requiring large-scale remediation, site repairs, contingency fund drawdown and extended operations.
major containment breach
structural damage
extended remediation
🚨
Political Exposure
$5.2M/yr
Public/political exposure event requiring sustained cover operations, litigation, large-scale misinformation and PR/legal settlement.
public leak
high-profile incident
litigation or government inquiry
Personnel
17 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#4] Dedicated 24/7 guards (two per shift plus overlap/supervision) as specified in analyst notes. |
| Research Scientist | 4 | [#16] PI and core scientists (EM physicists, anomaly specialists) forming the research team. |
| Engineer / Maintenance | 2 | [#16] Mechanical/cryogenics/electrical engineers to maintain detectors, robotics and shielded chamber. |
| Technician / Lab Assistant | 2 | [#16] Technicians for sample prep, instrumentation operation and remote manipulation support. |
| Administrative Staff | 1 | [#4, #16] Small administrative/ops oversight to coordinate logistics, legal requests and budgeting. |
Confidence Notes
Estimates use analyst ranges but the object is highly anomalous with large uncertain tail risks (R&D outcomes, breach severity and exploration costs). Wide ranges and contingent policies reduce confidence.