SCP-9910
Safe
~
medium confidence
SCP-9910
Expected annual
$576K
One-time setup
$628K
Annual recurring
$565K
Personnel
8
Estimated first-year one-time costs total $627,500, with recurring annual costs of $564,700; the largest cost drivers are environmental control/infrastructure and ongoing security/staffing, followed by research and legal/cover maintenance.
One-Time Capital Costs
Total: $628K
Annual Recurring Costs
Total: $565K/yr
Cost Scenarios
📊
Baseline
(baseline)
$565K/yr
Normal year with routine monitoring, scheduled maintenance, and planned research activity; no major incidents.
routine_maintenance
scheduled_research
no_major_incidents
🚨
Minor Incident
$590K/yr
Small containment/environmental incident (e.g., brief HVAC failure or localized humidity excursion) requiring emergency conservation intervention and minor repairs.
short_hvac_outage
localized_humidity_excursion
🚨
Major Environmental Failure
$715K/yr
Significant prolonged failure of environmental controls or power leading to extended conservation emergency, off-site stabilization, and possible temporary relocation.
prolonged_hvac_failure
extended_power_outage
major_moisture_exposure
🚨
Research Scale Up
$765K/yr
Opportunity or need to perform expanded analyses requiring major one-off purchases or expensive multi-site collaborations (e.g., purchase of instrumentation or large contracted projects).
major_analysis_project
instrument_purchase
large_collaborative_study
Personnel
8 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | Six full-time guards covering three shifts as the primary site-level artifact protection model [#15]. |
| Research Scientist | 1 | Head researcher assigned to SCP-9910 (0.25–0.5 FTE funded here, represented as one position) [#13]. |
| Conservator | 1 | Conservator allocation for monitoring and treatments (0.1–0.3 FTE typically) [#14]. |
Confidence Notes
Estimates are based on detailed analyst notes with itemized ranges; midpoints and conservative assumptions were used where ranges existed. Uncertainties remain around site-specific construction costs, exact utility energy use for the unusual climate setpoint, and whether capital instruments will be purchased versus contracted, so confidence is medium.